Volume 20, Issue 3 (IJIEPR 2009)                   IJIEPR 2009, 20(3): 92-98 | Back to browse issues page

XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Tareghian H R, Salari M. On the Optimal Frequency and Timing of Control Points in a Project’s Life Cycle. IJIEPR 2009; 20 (3) :92-98
URL: http://ijiepr.iust.ac.ir/article-1-70-en.html
1- , taregian@ferdowsi.um.ac.ir
Abstract:   (8946 Views)
The dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. Collection of information about the performance of projects at control points costs money. The corrective actions that may need to be taken to bring the project in line with the plan also costs money. On the other hand, penalties are usually imposed when due to “no monitoring” policies projects are delivered later than expected. Thence, this paper addresses two fundamental questions in this regard. First question concerns the optimal frequency of control during the life cycle of a project. The second question concerns the optimal timing of control points. Our solution methodology consists of a simulation-optimization model that optimizes the timing of control points using the attraction-repulsion mechanisms borrowed from the electromagnetism theory. A mathematical model is also used to optimally expedite the remaining part of the project when possible delays are to be compensated.
Full-Text [PDF 182 kb]   (2333 Downloads)    
Type of Study: Research | Subject: Other Related Subject
Received: 2010/02/2 | Published: 2009/09/15

Add your comments about this article : Your username or Email:
CAPTCHA

Send email to the article author


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.