zare baghabad F, khademi zare H. A three- stage algorithm for software cost and time estimation in fuzzy environment . IJIEPR 2015; 26 (3) :193-211
URL: http://ijiepr.iust.ac.ir/article-1-468-en.html
1- yazd university
2- yazd university , hkhademiz@yazduni.ac.ir
Abstract:   (6368 Views)

In this paper an efficient three- stage algorithm is developed for software production cost and time estimation. First stage includes a hybrid model composed of COCOMO and Function Points methods to increase estimation accuracy. Second stage encompasses paired comparisons matrix of analytical hierarchy process to determine amount of any resources consumed in each step of software production by experts’ opinions. Third stage concludes cost and time tables of production scheduling by using Work break structure (WBS) and network models of project control. In whole of all stages of this paper, triangular fuzzy numbers are used to express uncertainty existed in succession and repetition of each production step, time of beginning, ending, the duration of each task and costs of them. Retrieved results examined by 30 practical projects conclude accuracy of 93 percent for time estimation and 92 percent for cost one. Also suggested algorithm is more accurate than COCOMOІІ 2000 algorithm as 50 percent based on examined problems.

AWT IMAGE

Full-Text [PDF 384 kb]   (2416 Downloads)    
Type of Study: Research | Subject: Application of Computer in I.E
Received: 2012/09/30 | Accepted: 2015/09/20 | Published: 2016/01/24

Add your comments about this article : Your username or Email:
CAPTCHA

Send email to the article author


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.