Morovatdar R, Aghaie A, Haji Yakhchali S. Fuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure. IJIEPR. 2011; 22 (1) :73-82
URL: http://ijiepr.iust.ac.ir/article-1-491-en.html

is Associate Professor at the Department of Industrial Engineering, K.N.Toosi University of Technology, Tehran, Iran , aaghaie@kntu.ac.ir
Abstract:   (2338 Views)

  In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of imprecision namely activity duration, activity existence and precedence relation existence which make our general fuzzy project network. Subsequently, a corrected forward recursion is proposed for analysis of this network. Since the convexity and normalization of traditional fuzzy numbers are not satisfied, some corrected algebraic operations are also presented. Employing the proposed method for a real project reveals that our method results in more applicable and realistic times for activities and project makespan in comparison to

Classic fuzzy PERT.
Full-Text [PDF 486 kb]   (1399 Downloads)    
Type of Study: Research | Subject: Other Related Subject
Received: 2013/01/14

Add your comments about this article : Your username or email:
Write the security code in the box

Send email to the article author


© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb