Shirazi B. Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation. IJIEPR 2017; 28 (4) :461-481
URL:
http://ijiepr.iust.ac.ir/article-1-781-fa.html
Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation. نشریه بین المللی مهندسی صنایع و تحقیقات تولید. 1396; 28 (4) :461-481
URL: http://ijiepr.iust.ac.ir/article-1-781-fa.html
چکیده: (5248 مشاهده)
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material embankment activities regarding large-scale dam projects of Iran. The model develops a methodology for concurrent management of resources and revenue/expenditure estimation of dam's projects. This real-time control allows managers to simulate several scenarios and adopt the capability of complicated working policies. Results validation shows that the proposed model will assist project managers as a decision support tool in cost-efficient executive policymaking on resource configuration.
نوع مطالعه:
پژوهشي |
موضوع مقاله:
مدل های شبیه سازی و احتمالی دریافت: 1396/6/6 | پذیرش: 1396/8/8 | انتشار: 1396/8/24