جلد 23، شماره 4 - ( 8-1391 )                   جلد 23 شماره 4 صفحات 308-301 | برگشت به فهرست نسخه ها

XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Khorasanian D, Moslehi G. An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria. IJIEPR 2012; 23 (4) :301-308
URL: http://ijiepr.iust.ac.ir/article-1-452-fa.html
An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria. نشریه بین المللی مهندسی صنایع و تحقیقات تولید. 1391; 23 (4) :301-308

URL: http://ijiepr.iust.ac.ir/article-1-452-fa.html


چکیده:   (7029 مشاهده)
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is tested on the Taillard's instances. Computational results show the high efficiency of this algorithm with comparison state-of-the-art algorithms. We report new best solutions for 88 instances of 120 Taillard's instances.
     
نوع مطالعه: پژوهشي | موضوع مقاله: Production Planning & Control
دریافت: 1391/4/12 | پذیرش: 1393/4/30 | انتشار: 1393/4/30

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به نشریه بین المللی مهندسی صنایع و تحقیقات تولید می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2024 CC BY-NC 4.0 | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb