Volume 21, Number 1 (IJIEPR 2010)                   IJIEPR 2010, 21(1): 17-22 | Back to browse issues page


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Sadeghian R. How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot. IJIEPR. 2010; 21 (1) :17-22
URL: http://ijiepr.iust.ac.ir/article-1-150-en.html

, rsadeghian@basu.ac.ir
Abstract:   (4456 Views)
The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requirements Planning (CMRP) approach. We discuss the disadvantages of Discrete MRP (DMRP) approach and analyze the conditions, applications and the manner of applying CMRP approach in our problems.
Full-Text [PDF 731 kb]   (2204 Downloads)    
Type of Study: Research |
Received: 2010/08/25

Add your comments about this article : Your username or email:
Write the security code in the box

Send email to the article author


© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb