Biography

 CURRICULUM VITAE

  AWT IMAGE

Personal Data

Education

Academic Positions

Teaching Experience

Publications

Conference Attendance

 

Personal Data

  · Surname : Aryanezhad

  · Name: Mir Bahador

  · Present Position: Professor

  · Department: Industrial Engineering

  · Ph.D., University of California, Los Angeles, USA , 1980

  · Tel: +98 21 77 24 01 22

  · E-mail: Mirarya@iust.ac.ir

 

  Education

  · Doctor of Philosophy (PhD) in Operations Research , University of California, Los Angeles, 1976-1980

  · Master of Science (MS) in Operations Research , University of California, Los Angeles, 1974-1976

  · Bachelor of Science (BS) in Physics Engineering , Sharif University of Technology, 1970-1974

  

  Academic Positions

  · Professor , Faculty of Industrial Engineering, Iran University of Science and Technology (IUST), since1980

  · Director of Industrial Engineering Program , University of Science and Technology, since 1984

  · Editor-in-Chief , International Journal of Industrial Engineering, since 2004

  · Editorial board , International Journal of Engineering Science, since 1990

  · Editorial board , International Journal of Engineering, since 1990

  · Scientific Chair of 5th Industrial Engineering International Conference , 2006- 2007

  · Dean of Graduate Studies , Department of Industrial Engineering, University of Science and Technology,1989-1999

  · Dean of Department , Department of Industrial Engineering, University of Science and Technology, 1990- 1992

 

  Teaching Experience

  i) Graduate courses

  · Statistical Methods , Department of Industrial Engineering , Iran University of Science and Technology

  · Advanced Production Planning , Department of Industrial Engineering , Iran University of Science and Technology

  · Operations Research , Department of Industrial Engineering , Iran University of Science and Technology

  · Advanced Linear Programming , Department of Industrial Engineering , Iran University of Science and Technology

  · Mathematical Programming , Department of Industrial Engineering , Iran University of Science and Technology

  · Reliability , Department of Industrial Engineering , Iran University of Science and Technology

  ii) Undergraduate courses

  · Operations Research I , Department of Industrial Engineering , Iran University of Science and Technology

  · Operations Research II , Department of Industrial Engineering , Iran University of Science and Technology

  · Production Planning , Department of Industrial Engineering , Iran University of Science and Technology

  · Fundamental of Probability and Statistics , Department of Industrial Engineering , Iran University of Science and Technology

  

  Publications

  i) Selected Papers

  · Aryanezhad, M.B. , Seyed Amin Badri, Alireza Komijan, "Threshold-based Method for elevating the system’s constraint under theory of constraints (TOC)" , International Journal of Production Research , Article in press.

  · Aryanezhad, M.B. , M. Karimi-Nasab, S. Bakhshi, "Multiple batch size smoothing", Journal of Industrial Engineering, Article in press, 2009.

  · Aryanezhad, M.B. , M. Karimi-Nasab, H. Maleki, "A fuzzy random multi-objective for portfolio selection", International Journal of Industrial Engineering, Article in press, 2009.

  · Aryanezhad, M.B. , Mohammad Hemati, "A new genetic algorithm for solving non-convex nonlinear programming problems", Applied Mathematics and Computation, Vol.199, No. 1, pp186-194, 2008.

  · Aryanezhad, M.B. , V. Deljoo, S.M.J. Mirzapour Al-e-hashem, " Dynamic cell formation and the worker assignment problem: a new model", The International Journal of Advanced Manufacturing Technology, pp1-14, Article in Press, 2008.

  · Taleizadeh, A.A., M.B. Aryanezhad , S.T.A. Niaki, " Optimizing multi-product multi-constraint inventory control systems with stochastic replenishments ", Journal of Applied Sciences, Vol. 8, No. 7, pp1228-1234, 2008.

  · Aryanezhad, M.B. , A.S. Kheirkhah, V. Deljoo, S.M.J. Mirzapour Al-e-hashem, "Designing safe job rotation schedules based upon workers' skills", The International Journal of Advanced Manufacturing Technology , pp1-7, Article in Press, 2008.

  · Roghanian, E., M.B. Aryanezhad, S.J. Sadjadi, "Integrating goal programming, Kuhn–Tucker conditions, and penalty function approaches to solve linear bi-level programming problems", Applied Mathematics and Computation, Vol. 195, No. 2, pp585-590, 2008.

  · Sadjadi, S.j, M.B. Aryanezhad, Mohsen Ziaee, "The General Flowshop Scheduling Problem: Mathematical Models", Journal of Applied Sciences, Vol. 8, No. 17, pp3032-3037, 2008.

  · Aryanezhad, M.B. , H. Sahebi, "An Inventory Discount Model under JIT", World Applied Sciences Journal, Vol.4, No. 4, 2008.

  · Aryanezhad, M.B. , E. Roghanian, "A bi-level linear multi-objective decision making model with interval coefficients for supply chain coordination", International Journal of Engineering Science, Vol. 19, No. 1-2, pp67-74, 2008.

  · Tavakkoli-Moghaddam, R., M.B. Aryanezhad , H. Kazemipoor, A. Salehipour, "A threshold accepting alg`orithm for partitioning matchines in a tandem automated guided vehicle", International Journal of Engineering Science, Vol. 19, No. 1-2, pp33-42, 2008.

  · Kaboli, A., M.B. Aryanezhad, K. Shahanaghi, I. Niroomand, "A new method for plant location selection problem: A fuzzy-AHP approach", Conference Proceedings - IEEE International Conference on Systems, No. 4413890, pp582-586, 2007.

  · Mojibi, T., M.B. Aryanezhad, M. Tabari, S. Khorshidi, "Balance score card and social responsibility in public organizations", IEEE International Conference on Industrial Engineering and Engineering Management, No. 4419201, pp307-311, 2007.

  · Ashtiani, B., G.R. Jalali, M.B. Aryanezhad, A. Makui, "A new approach for buffer sizing in Critical Chain scheduling", Conference on Industrial Engineering and Engineering Management, 4419350, pp1037-1041, 2007.

  · Ahi, Arshia, Mir. B. Aryanezhad, Behzad Ashtiani, A. Makui, "An investigation on the Multiple Attribute Decision Making (MADM) methods for solving the cell formation problem", IEEE International Conference on Industrial Engineering and Engineering Management, No. 4419282, pp709-712, 2007.

  · Tavakkoli-Moghaddam, R., M.B. Aryanezhad, N. Safaei, M. Vasei, A. Azaron, "A new approach for the cellular manufacturing problem in fuzzy dynamic conditions by a genetic algorithm", Journal of Intelligent & Fuzzy Systems, Vol. 18, No. 4, pp. 363-376, 2007.

  · Roghanian, E., S.J. Sadjadi, M.B. Aryanezhad, "A probabilistic bi-level linear multi-objective programming problem to supply chain planning", Applied Mathematics and Computation, Vol. 188, No. 1, pp. 786-800, 2007.

  · Kaboli, A., M.B. Aryanezhad, K. Shahanaghi, R. Tavakkoli-Moghaddam, "A holistic approach based on MCDM for solving location problems", International Journal of Engineering, Transaction A: Basic, Vol. 20, No. 3, pp. 251-262, 2007.

  · Esmaeili, M., P. Zeephongsekul, M. B. Aryanezhad, “A joint pricing and lot sizing models with discount: a geometric programming approach”, ANZIAM Journal, Vol. 49, 2007.

  · Feylizadeh, M.R, M. B. Aryanezhad, M. Bagherpour, "A Fuzzy Goal Programming Approach in Project-Time Cost Analysis Problem", Second International Conference on Modeling, Simulation and Applied Optimization, (ICMSAO), United Arab Emirates, March, 2007.

  · Sedighizadeh, D., M. Sedighizadeh, M.B. Aryanezhad, " An interval-based MADM approach for electric utility resource planning" , 14th IASTED International Conference on Applied Simulation and Modeling, No. 469-022, pp237-241, 2005.

  · Tavakkoli-Moghaddam, R., M.B. Aryanezhad, N. Safaei, A. Azaron, "Solving a dynamic cell formation problem using metaheuristics", Applied Mathematics and Computation, Vol. 170, No. 2, pp761-780, 2005.

  · Aryanezhad, M.B. , F. Zandi, "A new fuzzy method for trip distribution forecasting in multi-commodity transportation networks", Amirkabir (Journal of Science and Technology), Vol. 16, No. 62 B, pp92-101, 2005.

  · Sadjadi, S.j, M. Ouroji, M.B. Aryanezhad, "Optimal Production and Marketing Planning", Computational Optimization and Applications, Vol. 30, No. 2, pp203-214, 2005.

  · Esfandiari, B., M.B. Aryanezhad, S.A. Abrishamifar, "Open pit optimisation including mineral dressing criteria using 0-1 non-linear goal programming", Institution of Mining and Metallurgy, Section A: Mining Technology, Vol. 113, No. 1, ppA3-A13, 2004.

  · Aryanezhad , M.B., A.R. Komijani. "An Improved Algorithm on Optimization Product Mix under the Theory of Constraints", International Journal of Production Research, Vol. 42, No. 20, pp4221- 4233, 2004.

  · Aryanezhad , M.B., R.M.H. Najizadeh, A new algorithm for ranking efficient decision making units in data envelopment analysis”, 4th International Symposium of DEA, 2004.

  · Sadjadi, S.j, M.B. Aryanezhad, B.F. Moghaddam, "A Dynamic Programming Approach to Solve Efficient Frontier", Mathematical Methods of Operations Research, Vol. 60, No 2, pp 203-214, 2004.

  · A.H. Sarfaraz, S. J. Sadjadi, M.B. Aryanezhad, "A Fuzzy Approach to Solve a Multi- Objective Linear Fractional Inventory Model", 3th Industrial Engineering International Conference, Iran, 2004.

  · Aryanezhad, M.B. , S. Ghavampour. "Two Stage Multiple Attribute Decision", IUST International Journal of Engineering, Vol. 17-2, Transactions A: Basics, pp. 135-144, 2004.

  · Makouie, A, M.B. Aryanezhad, J. Efstathiou, A. Calinescu, "A New Method for Measuring The Static Complexity in Manufacturing". Journal of Operational Research Society, Vol. 54, No. 5, pp. 555-558, 2003.

  · Aryanezhad , M.B., E. Teimouri, "An integrated mathematical decision making model for supplier selection and development problem", Amirkabir (Journal of Science and Technology), Vol. 13, No. 54 D, pp548-564, 2003.

  · Tavakkoli-Moghaddam, R., M.B. Aryanezhad, A.H. Latifian, "Solving cellular manufacturing systems by tabu search", Tarbiat Modaress University, Journal of Technology and Engineering, Vol. 11, 2003, 65-77.

  · Heydari M., M.B. Aryanezhad, S.K. Chahat Soughi, "Integration of material requirement planning and theory of constraint", Amirkabir (Journal of Science and Technology), Vol. 13, No. 51, pp511-524, 2002.

  · Aryanezhad , M.B., H. Mohammadi, "A new approach versus Benders’ decomposition in aggregate production planning", International Journal of Engineering, Vol. 14, No. 4, pp351-360, 2001.

  · Aryanezhad , Mir-Bahador Q., "An algorithm based on a new sufficient condition of optimality in dynamic lot size model", European Journal of Operational Research, Vol. 59, No. 3, pp. 425-433, 1992.

  · Aryanezhad, M., "Partially observable Markovian maintenance process with continuous cost functions", Journal of Engineering, Islamic Republic of Iran, Vol. 1, No. 4, pp 201-209, 1988.

  · Aryanezhad, M., "Replacement and correction models with imperfect information", Ann Arbor, Mich: University Microfilms International, 1983.

  ii) Selected Books

  · Aryanezhad, M.B. , M. T. Taghavi Fard, K. Khalili, “Ant Colony Optimization”, Islamic Azad University Publication, 2008.

  · Aryanezhad, M.B. , M. Iran poor, K. Kianfar, B. Naderi, “Inventory Management and Control”, Islamic Azad University Publication, 2008.

  · Aryanezhad, M.B. , S. J. Sadjadi, “Operations Research II”, Mir Publication, 4th Edition, 2008.

  · Aryanezhad, M.B. , J. Modiri, “Opearions Research”, IUST Publication, 2007.

  · Aryanezhad, M.B. , “Production Planning”, Terme Publication, 2003.

  · Aryanezhad, M.B. , M. Zahabiyoun, “Probability and Statistics”, IUST Publication, 2002. (Translation)

  · Aryanezhad, M.B. , S. J. Sadjadi, “Linear Programming”, IUST Publication, 2000.

  · Aryanezhad, M.B. , S. J. Sadjadi, “Advanced Operations Research”, Mir Publication, 1999.

  · Aryanezhad, M.B., M. Modaress Yazdi, “Integrated Production Control Systems”, Nashr-e-daneshgahi Publication, 1994. (Translation)

  

  Conference Attendance

  · 5th Industrial Engineering International Conference (As a Scientific Chair), Tehran, Iran, 2007

  · Attendance at more than 30 Domestic and International Conferences

  · More than 70 Accepted Papers in Domestic and International Conferences

 


View: 10493 Time(s)   |   Print: 2484 Time(s)   |   Email: 346 Time(s)   |   0 Comment(s)