جلد 19، شماره 4 - ( 9-1387 )                   جلد 19 شماره 4 صفحات 56-47 | برگشت به فهرست نسخه ها

XML English Abstract Print


چکیده:   (9318 مشاهده)

  In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To compare the associated results, a branch-and-bound (B&B) method is designed and the upper/lower limits are also introduced in this method. To show the effectiveness of these methods, a number of different types of problems are generated and then solved. Based on the results of the test problems, the proposed SA has a small error, and computational time for achieving the best result is very small.

     
نوع مطالعه: پژوهشي | موضوع مقاله: Material Managment
دریافت: 1388/1/29 | انتشار: 1387/9/25

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.