جلد 25، شماره 1 - ( 11-1392 )                   جلد 25 شماره 1 صفحات 65-70 | برگشت به فهرست نسخه ها


XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Nahavandi N, Asadi Gangraj E. A New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines. IJIEPR. 2014; 25 (1) :65-70
URL: http://ijiepr.iust.ac.ir/article-1-478-fa.html
A New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines. نشریه بین المللی مهندسی صنایع و تحقیقات تولید. 1392; 25 (1) :65-70

URL: http://ijiepr.iust.ac.ir/article-1-478-fa.html


چکیده:   (2110 مشاهده)
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessment the quality of this heuristic, this paper develop a global lower bound on FFS makespan problems with unrelated parallel machines.
متن کامل [DOCX 116 kb]   (1415 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: و موضوعات مربوط
دریافت: ۱۳۹۱/۹/۸ | پذیرش: ۱۳۹۲/۴/۱۵ | انتشار: ۱۳۹۲/۱۱/۱۳

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
کد امنیتی را در کادر بنویسید

کلیه حقوق این وب سایت متعلق به نشریه بین المللی مهندسی صنایع و تحقیقات تولید می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb