Volume 24, Number 4 (IJIEPR 2013)                   IJIEPR 2013, 24(4): 307-315 | Back to browse issues page


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Sarkar S, Tripti Chakrabarti T. An EPQ Model of Exponential Deterioration With Fuzzy Demand and Production With Shortages. IJIEPR. 2013; 24 (4) :307-315
URL: http://ijiepr.iust.ac.ir/article-1-314-en.html

M.Sc ,Tech Calcutta university , sanchita771@rediffmail.com
Abstract:   (1886 Views)
In the fundamental production inventory model, in order to solve the economic production quantity (EPQ) we always fix both the demand quantity and the production quantity per day. But, in the real situation, both of them probably will have little disturbances every day. Therefore, we should fuzzify both of them to solve the economic production quantity (q*) per cycle. Using α-cut for defuzzification the total variable cost per unit time is derived. Therefore the problem is reduced to crisp annual costs. The multi-objective model is solved by Global Criteria Method with the help of GRG (Generalized Reduced Gradient) Technique. In this model shortages are permitted and fully backordered. The purpose of this paper is to investigate a computing schema for the EPQ in the fuzzy sense. We find that, after defuzzification, the total cost in fuzzy model is less than in the crisp model. So it permits better use of the EPQ model in the fuzzy sense arising with little disturbances in the production, and demand.
Full-Text [PDF 443 kb]   (1089 Downloads)    
Subject: Operations Research
Received: 2011/09/29 | Accepted: 2013/10/28 | Published: 2014/02/2

Add your comments about this article : Your username or email:
Write the security code in the box

Send email to the article author


© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb