جلد 21، شماره 2 - ( 2-1389 )                   جلد 21 شماره 2 صفحات 97-104 | برگشت به فهرست نسخه ها


XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Ramezanian R, Aryanezhad M, Heydari M. A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production. IJIEPR. 2010; 21 (2) :97-104
URL: http://ijiepr.iust.ac.ir/article-1-198-fa.html
A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production. نشریه بین المللی مهندسی صنایع و تحقیقات تولید. 1389; 21 (2) :97-104

URL: http://ijiepr.iust.ac.ir/article-1-198-fa.html


چکیده:   (12327 مشاهده)

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapted genetic algorithm based on bypass consideration to solve the problem. The basic parameters of this meta-heuristic are briefly discussed in this paper. Also a computational experiment is conducted to evaluate the performance of the implemented methods. The implemented algorithm can be used to solve large scale flow shop scheduling problem with bypass effectively .

     
نوع مطالعه: پژوهشي | موضوع مقاله: و موضوعات مربوط
دریافت: ۱۳۸۹/۹/۱

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
کد امنیتی را در کادر بنویسید

کلیه حقوق این وب سایت متعلق به نشریه بین المللی مهندسی صنایع و تحقیقات تولید می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2015 All Rights Reserved | International Journal of Industrial Engineering & Production Research

Designed & Developed by : Yektaweb